CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY The Nigerian Railway Corporation (NRC) has been in existence for years. It is regarded the largest transport corporation in Nigeria and has a high network operations. The Nigerian railway corporation is One Hundred and Fourteen years (114) old and it runs a unilaterally designed track system of 1067mm charge gauge. Only 30km of its track distribution is in double track and that is within Lagos area. Nigerian Railway Corporation actually commenced rail business activities with the construction of the first rail line from Lagos to Ibadan 193m between 1998 and 1901. By 1964 when the construction of 640km Kano-Maiduguri rail line, then known as Bornu extension, was completed, the present core of the railway network hard been put in place. Presently, the railway system is made up of 3’505 route kilometers and 4332 track kilometers. In addition to this is the 19km 1067mm gauge extension from Port-Harcourt to one deep sea port and the 277km standard gauge rail construction
Can't find what you are looking for? Hire An Eduproject Writer To Work On Your Topic or Call 0704-692-9508.
Proceed to Hire a Writer »